Week 2 of 15 Schedule
For week 2, I worked to convert my scene into clip studio files by importing the scene to each different scene file. This consists of mostly tedious work of exporting each clip from premiere to mostly 10-20 secs mp4 videos, depending on how long the scene went.
By doing it this way, it should help me to follow the guidelines and timings I have in my Animatic. Tho it is subject to change later down the line when I realize this animation part needs more or less timing but that's a struggle for future me to worry about.
One other thing I did was to check the frame rate, which I will have to struggle with for the scene 1 and 3 because I have them at 30 fps instead of 24 fps. But I will roll with it because despite me testing when converting in multiple ways, the timing changes if I convert so rn, 30 fps it is for those two clips. I also double check to see if exporting went through and works for my clip files.
Comments
Post a Comment